York Street

Luton

residential (land)
Guide Price:£3,000,000

Book a viewing for York Street

We'll get in touch with you to arrange a viewing.

By submitting this form, you acknowledge that your data will be processed by Connells Limited for the purposes of providing the service and/or product you have requested. Personal data will be processed in accordance with the Data Protection Act 2018 and all other applicable data protection law and regulation. Full details of how we may process your data can be found in our Privacy Notice

Property details

Key features

  • Detailed Planning Granted for 57 - 100% Private Dwellings
  • 0.3 miles walk from the new Luton Town Football Club
  • 0.3 miles walk to Luton Train
  • 15 minute journey to the new Station Universal Studios UK
  • 1.7 Billion Pound Re Generation
  • Only 2.6 miles in a car to London Luton Airport.
  • Fast trains to Londons Kings Cross St Pancras from 22 minutes
  • Planning Ref: 22/00400/FUL - s106 Negotiated

Council Tax Band:

Contact Branch

Tenure:

Freehold

A unique opportunity to get ahead of the curve, we feel this is the ideal time to be taking advantage of Luton's relatively low prices before the proposed rejuvenation of the Town Centre New Football Club Stadium, and its facilities have an impact on values.

Luton is undergoing a massive £1.7 billion, multi-year transformation aimed at revitalising its town centre, enhancing sustainability, and boosting the local economy.

The rejuvenation, guided by the Luton Town Centre Masterplan (2021) and updated in 2025, focuses on shifting the area from a 1960' car-centric design to a vibrant, green, and pedestrian-friendly hub with a significantly increased residential population. Through an accessible mix of spaces and activities, the town centre will welcome all residents, visitors, businesses and investors into a clean and green environment. Changes will support health and well-being and actively address the climate and biodiversity emergency. A string of well-connected green spaces and improved streets through the town centre will provide moments for play and relaxation - spaces that are safe to enjoy and family friendly.

Creativity and local young talent will be nurtured and given a platform to shape the character of the town centre. Stronger partnerships between the university and local organisations will support a new generation of Luton-made businesses to start, grow and thrive, empowering Luton's entrepreneurs, delivering genuine jobs and opportunities








Industrial Logistics Growth
*Major new developments near the airport including 1.2?million sq ft logistics space
*Expected to generate thousands of jobs in logistics, distribution, and light industry


Bartlett Sq. Green Horizon
*New commercial and business parks supporting ~2,000 jobs
*Focus on offices, light industrial, and innovation-led business space


Power Crt Mixed-Use Regen
*New 25,000-capacity stadium with surrounding housing, retail, and leisure
*Construction and operational phases expected to create - 1,000 permanent jobs


Transport Connectivity
*Luton DART links the train station directly to the airport, improving accessibility
*Supports commuter and business growth across the region


Town Centre Regeneration
*£136M mixed-use project delivering apartments, commercial space, and public amenities
*Strengthens the town centre and increases housing demand


Council Economic Strategy
*Aims to deliver £500M annual economic growth, 23,000 new jobs, and 150,000sqm of new commercial space by 2032
*Focused on attracting business investment, boosting skills, and supporting long-term housing demand


Owners Comments



Building Design.
We have designed the building with buildability in mind, from the ground up we have stacked the walls to keep the structure simple to build. We have designed the layout so it could be built using RC Podium to the 1st floor and traditional brick/block with concrete planks/stairs. Using these methods make keeps the fire and sound proofing to a minimal.The design also allows it to be built in RC frame/ Steel Frame etc if that was a preferred method with additional floors in mind for the future. Externally we have Designed as Brick/Block and render without any cladding to eliminate the fire risks and speed up the build. The building has been designed in 2 blocks adjoining on one side with separate entrances and cores so the build could be built out/sold in phases to help with cashflow if necessary.




Services
Electricity, Water, Gas and communication supplies are all available to the site. We currently have Gas, water and 3 phase electricity on site, there are no 3rd party services or easements running through the site.

Demolition
Demolition of the existing buildings are simple single storey brick buildings with timber/felt flat roofs. External boundary walls are brick built and may be useful to secure site throughout the build depending on the builders preference.


Planning
The site has full planning approval granted on 24th April 2024, work required to discharge the conditions required for commencement and to implement the planning permission has been done and submitted to the council for approval. These documents will be included with the sale.


Groundworks Infrastructure
Extensive ground investigations have been completed across the site, including contamination assessments, ground bearing reports, window sampling and dynamic probing. Phase 1 has already been successfully delivered, providing proven knowledge of the local ground conditions. The findings indicate that development can proceed without any anticipated abnormal or unusual site clearance constraints. The ground conditions are considered suitable for conventional shallow foundation solutions, such as strip or pad foundations (subject to structural engineer design). All supporting technical reports are available on request.
Groundwater levels have been confirmed by borehole at a minimum depth of 20 metres below ground level, with wider area data indicating levels in excess of 55 metres. As such, groundwater is not anticipated to present any development constraints.
Written consent has been secured from Thames Water for connection to the existing on-site storm and foul sewer infrastructure, which is suitably positioned to accommodate the proposed drainage design. Surface water will be managed via a straightforward, shallow attenuation tank system, providing a practical and efficient drainage solution


London Luton Airport Expansion
*Increasing annual passenger capacity from -18M to 32M
*Expected to create up to 11,000 jobs and contribute £1.5 Billion annually to the local economy

Utilities, rights & restrictions

Utility Supply:

  • ElectricityContact branch
  • WaterContact branch
  • HeatingContact branch
  • BroadbandContact branch
  • SewerageContact branch

Rights & Restrictions:

  • Private rights of wayContact branch
  • Public rights of wayContact branch
  • Listed propertyContact branch
  • RestrictionsContact branch

Risks:

  • Flooded in last 5 yearsContact branch
  • Flood defencesContact branch
  • Source of floodContact branch

Guidance Notes

While every reasonable effort is made to ensure the accuracy of descriptions and content, we should make you aware of the following guidance or limitations.

(1) MONEY LAUNDERING REGULATIONS Intending purchasers will be asked to produce identification documentation at a later stage and we would ask for your co-operation in order that there will be no delay in agreeing the sale. (2) These particulars do not constitute part or all of an offer or contract. (3) The measurements indicated are supplied for guidance only and as such must be considered incorrect. (4) Potential buyers are advised to recheck the measurements before committing to any expense. (5) We have not tested any apparatus, equipment, fixtures, fittings or services and it is the buyers interests to check the working condition of any appliances. (6) We have not sought to verify the legal title of the property and the buyers must obtain verification from their solicitor.

Use Our Homefinder Service

With our HOME FINDER SERVICE, we get a real understanding of what is on your wish list and then put all of our experience, local knowledge, branch network and extensive contacts to work to find your perfect property.

Valuation Type
By submitting this form, you acknowledge that your data will be processed by Connells Limited for the purposes of providing the service and/or product you have requested. Personal data will be processed in accordance with the Data Protection Act 2018 and all other applicable data protection law and regulation. Full details of how we may process your data can be found in our Privacy Notice

Mortgage Calculator

Our handy mortgage calculator helps you to estimate what your monthly repayments could be. * Terms and conditions apply. Please be aware, these results are for illustrative purposes only and should not be considered as a mortgage quote. These are based on a repayment mortgage and may vary depending on the term and interest rate of your mortgage. Lender fees may also be applicable. If you would like guidance on the right mortgage for you, we recommend booking a mortgage appointment and speak to one of our mortgage consultants who will be more than happy to help. ** The 4.19% annual interest rate is based on the Connells Group average mortgage interest rate taken from this year YTD and is correct as at 29/01/26. Any fees payable will be explained in your initial no-obligation appointment, before you choose whether to use our Mortgage Services.

Mortgage Enquiry

We'll get in touch with you regarding a mortgage.

Similar Properties

PLEASE BE AWARE, THESE RESULTS ARE FOR ILLUSTRATIVE PURPOSES ONLY AND SHOULD NOT BE CONSIDERED AS A MORTGAGE QUOTE. THESE ARE BASED ON A REPAYMENT MORTGAGE AND MAY VARY DEPENDING ON THE TERM AND INTEREST RATE OF YOUR MORTGAGE. LENDER FEES MAY ALSO BE APPLICABLE. IF YOU WOULD LIKE GUIDANCE ON THE RIGHT MORTGAGE FOR YOU, WE RECOMMEND SPEAKING TO ONE OF OUR MORTGAGE CONSULTANTS WHO WILL BE MORE THAN HAPPY TO HELP. *THE 4.7% ANNUAL INTEREST RATE IS BASED ON THE CONNELLS GROUP AVERAGE MORTGAGE INTEREST RATE TAKEN FROM THE PERIOD OF 01/01/2024 – 31/12/2024 AND IS CORRECT AS AT 13/02/2025.

Any fees payable will be explained in your initial no-obligation appointment, before you choose whether to use our Mortgage Services.